AI Memory

risk-register.uai

Records risks, severity, owner, mitigation, evidence, trigger, and current decision posture. Required for project/developer packages that carry security, privacy, deployment, legal, product, or reliability risk.

  • Record UAIX-MEMR-2326
  • Path /en-us/ai-memory/uai-files/risk-register-uai/
  • Use Canonical public record

Document status

Public standards page Published on UAIX as part of the current public standards record
Code
UAIX-MEMR-2326
Surface
AI Memory
Access
Public and linkable

How to use this page

Use this page as the canonical public reference for risk-register.uai and its standards-facing content.

For agents: apply the relevant guidance to the user's target site or repository. Do not copy this UAIX page, create a page about the guidance, or treat this page as runtime authority unless the user explicitly asks for that output.

Records risks, severity, owner, mitigation, evidence, trigger, and current decision posture.

risk-register.uai
File.uai/risk-register.uai
CategoryEvidence and audit files
Required statusRequired for project/developer packages that carry security, privacy, deployment, legal, product, or reliability risk
Main readerReviewer, owner, receiving AI
Update frequencyWhen risk status, severity, mitigation, owner, or evidence changes.
Human review requirementRequired for high-impact risks and before releases that alter risk posture.
No-op trigger typeUnowned risk, stale mitigation, unknown severity, or release with unresolved high-impact risk.

What this file is

risk-register.uai is a bounded UAIX memory record. It is meant to be read before action, compared against related package files, and updated only through a reviewed package-memory change.

Why necessary

The file keeps this class of knowledge explicit instead of burying it in chat history, private assumptions, or stale generated summaries.

When required

Required for project/developer packages that carry security, privacy, deployment, legal, product, or reliability risk.

What belongs

  • Accepted current facts for the declared package scope.
  • Source, owner, reviewer, or evidence pointers needed to verify the record.
  • No-op or escalation triggers that protect the package boundary.
  • Compact instructions the next reader can act on without guessing.

What does not belong

  • Raw chat dumps, unresolved brainstorming, or unreviewed generated summaries.
  • Secrets, private credentials, personal data beyond the declared minimum, or unsupported public claims.
  • Rules that belong in a more specific file such as constraints.uai, test-plan.uai, or deployment-memory-and-test-report.uai.
  • Historical notes that should live in archives until reviewed and promoted.

How receiving AI should use it

  • Read memory-maintenance.uai first, then this file when it is in the declared package scope.
  • Compare it with identity.uai, world-context.uai, startup-packet.uai, progress.uai, and the manifest before trusting it as current.
  • Use the no-op trigger as a stop point when the file is missing, stale, contradictory, or outside the declared package profile.
  • Record any update in the right typed `.uai` record and the package changelog when the change affects future agents.

How human reviewer should use it

  • Confirm the file states a concrete required scope rather than a softer invitation to read it.
  • Check that current facts have an owner, evidence path, or review source.
  • Confirm outdated material was moved to archives or replaced with a dated current record.
  • Reject vague language that lets agents ignore package-critical material.

Scenario examples

  • A receiving agent opens a Project Handoff package and uses this record to decide whether work may proceed.
  • A reviewer sees a contradiction between files and uses the no-op trigger to require clarification before release.
  • A maintenance pass promotes a reviewed fact into this file and retires the stale note from active memory.

No-op and human-review triggers

  • Missing file for its declared required scope.
  • Conflict with universal launch-baseline files.
  • Current package work depends on an unreviewed fact.
  • The file claims authority beyond its declared profile, mode, package type, or capability.

Update and maintenance rules

  • Keep entries short enough to be read at startup.
  • Date meaningful updates and record why the change happened.
  • Move stale detail to archives after accepted current facts are captured.
  • Align generated exports and human-facing memory after changes.

Relationship to other .uai files

  • identity.uai names the package and owner.
  • world-context.uai locates the operating environment.
  • memory-maintenance.uai governs lifecycle, required active instruction anchors, validation behavior, and memory write safety.
  • totem.uai and taboo.uai are default guardrails to read and obey; modifications require exact human artifact-and-operation authorization.
  • totem.uai, taboo.uai, and talisman.uai are default active instructions; mutation requires exact human artifact-and-operation authorization.
  • startup-packet.uai points to the active `.uai/` read order, and progress.uai carries reviewed current status.

Minimal example

Code example
# risk-register.uai
file: .uai/risk-register.uai
required_status: Required for project/developer packages that carry security, privacy, deployment, legal, product, or reliability risk
owner: human-reviewed owner or steward
current_state: accepted current record for this package scope
no_op_trigger: Unowned risk, stale mitigation, unknown severity, or release with unresolved high-impact risk.
evidence: link or local pointer to reviewed source
review_status: current until superseded by owner review

Completeness checklist

  • Required status names the exact scope.
  • Owner or reviewer is clear.
  • Current facts match related .uai files.
  • No-op triggers are concrete.
  • Stale material has an archive or replacement path.

Common mistakes

  • Using softer language that agents treat as ignorable.
  • Mixing current truth with raw source intake.
  • Letting the file contradict another required record.
  • Leaving no review path for high-impact changes.

Machine-readable digest

Agents should treat this digest as page-orientation evidence, not runtime authority.